Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
Total replacement of the old steam heating system , with a modern efficient forced air system that will provide heat and A/C. This includes electrical system upgrades to the building.
Upgrade of our existing fire alarm notification system.
Protection against fire and water service upgrade.
Repointing and painting of exterior, replacement of exterior windows with historically accurate windows, to seal up drafts and to provide better heating and cooling efficiency
Stair tower from upper floors and elevator, so third floor can reopen to the public.
The Reading Area Firefighters Museum is temporary closed, due to the ongoing HVAC renovations. We are expected to reopen late Spring 2025 if all goes to plan.